Spargers Distributors

CONTRIBUTIONS TO OUR CUSTOMERS

c

f

i

 

Project #1

Project Detail

Project: MTUXN-2

Equipment: Spargers-Distributors

Date: June 2014

Vendor Location: Pressure Parts Fabricator in Nuevo Leon, Mexico.

Item #5

Review on CMTRs per ITP 99MI7856-567003 Rev 0 Item 6.8, GA Drawing 6514-03-04-001 Rev C, Detail Drawing 764-245-32 Rev 1 and Customer Piping Accepted Manufacturer List.

Item Inspected: All piping material ítems for Spargers.

Findings: All CMTRs for Austenitic stainless steel ítems as received at Vendor Facilities in material SA 182 F304/F304L and SA-312 Tp 304/304L, reflecting on Material Manufacturers Not included in Customer Piping Accepted Manufacturer List.

Re-Inspection: Customer has confirmed on rejection of all referenced SS Material Items. Vendor finally has gotten again all new SS Material ítems in Compliance to Referenced Project Requirements.

v

CALL US NOW

 

Office: +52 81 2185 7616

Mobile: +52 81 8366 3611

#

COME VISIT US

 

14 de Abril 141, Colonia 21 de Enero, CP 67160, Guadalupe N.L., México

3

SEND US MESSAGE

 

E-Mail: contact@frazainspection.com

 

"Unwavering Passion and Enthusiasm for the Service since 1987"

c

f

i

© 2019 Fraza Inspection Company  - All Rights Reserved

  • Project #1

    Project Detail

    Project: MTUXN-2

    Equipment: Spargers-Distributors

    Date: June 2014

    Vendor Location: Pressure Parts Fabricator in Nuevo Leon, Mexico.

    • Item #1

      Review on CMTRs per ITP 99MI7856-567003 Rev 0 Item 6.8, GA Drawing 6514-03-04-001 Rev C, Detail Drawing 764-245-32 Rev 1 and Customer Piping Accepted Manufacturer List.

      Item Inspected: All piping material ítems for Spargers.

      Findings: All CMTRs for Austenitic stainless steel ítems as received at Vendor Facilities in material SA 182 F304/F304L and SA-312 Tp 304/304L, reflecting on Material Manufacturers Not included in Customer Piping Accepted Manufacturer List.

      Re-Inspection: Customer has confirmed on rejection of all referenced SS Material Items. Vendor finally has gotten again all new SS Material ítems in Compliance to Referenced Project Requirements.