Project Detail
Project: MTUXN-2
Equipment: Spargers-Distributors
Date: June 2014
Vendor Location: Pressure Parts Fabricator in Nuevo Leon, Mexico.
Review on CMTRs per ITP 99MI7856-567003 Rev 0 Item 6.8, GA Drawing 6514-03-04-001 Rev C, Detail Drawing 764-245-32 Rev 1 and Customer Piping Accepted Manufacturer List.
Item Inspected: All piping material ítems for Spargers.
Findings: All CMTRs for Austenitic stainless steel ítems as received at Vendor Facilities in material SA 182 F304/F304L and SA-312 Tp 304/304L, reflecting on Material Manufacturers Not included in Customer Piping Accepted Manufacturer List.
Re-Inspection: Customer has confirmed on rejection of all referenced SS Material Items. Vendor finally has gotten again all new SS Material ítems in Compliance to Referenced Project Requirements.
© 2019 Fraza Inspection Company - All Rights Reserved
Project #1
Project Detail
Project: MTUXN-2
Equipment: Spargers-Distributors
Date: June 2014
Vendor Location: Pressure Parts Fabricator in Nuevo Leon, Mexico.
Item #1
Review on CMTRs per ITP 99MI7856-567003 Rev 0 Item 6.8, GA Drawing 6514-03-04-001 Rev C, Detail Drawing 764-245-32 Rev 1 and Customer Piping Accepted Manufacturer List.
Item Inspected: All piping material ítems for Spargers.
Findings: All CMTRs for Austenitic stainless steel ítems as received at Vendor Facilities in material SA 182 F304/F304L and SA-312 Tp 304/304L, reflecting on Material Manufacturers Not included in Customer Piping Accepted Manufacturer List.
Re-Inspection: Customer has confirmed on rejection of all referenced SS Material Items. Vendor finally has gotten again all new SS Material ítems in Compliance to Referenced Project Requirements.