Project Detail
Project: North Pass Energy Unit 02
Equipment: Exhaust System Equipments
Date: May 2012 to September 2012
Vendor Location: Fabricator of Exhaust System Equipments in Nuevo Leon, Mexico.
Witness on Insulation/Fibering per ITP-50921-01 Rev 2 Item 16 and Customer Specification QRT70550 Rev 4.
Items Inspected: Transition Exhaust Item 42.
Findings: Observed at least two locations with Thru Splices-Lap (Splices of two consecutives fibering layers matching), Not Acceptable to Referenced Customer Specification Section 6.0.
Re-Inspection: Referenced Fibering Issues have been corrected in accordance with Requirements per Referenced Project Documents, accordingly the Fibering Process has gone ahead. See Photo as Illustration of Referenced Issue.
Benefits to Our Customer: By using Fraza Inspection Team, Customer saved a lot of of time and money preventing excessive expenses per back charges for Reworks at field site per unacceptable issues on Insulation-Fibering if Not Repaired in timely manner at Vendor Shop.
Project Detail
Project: Black Deer Unit 04
Equipments: Oil Water Separators
Date: September 2010 to October 2010
Vendor Location: Oil Water Separators Fabricator in Coahuila, Mexico.
Visual Inspection on External Fiber Glassing(FRP) per Inspection Attribute List # 16 and Data Sheet TOB-JH-DS-U-IR-01 Rev 1.
Item Inspected: Circular Extension of Oil Water Separator.
Findings: External Fiber Glassing(FRP) of Circular Extension observed with Lack of Adherence between the Steel and the Fiber Glassing (FRP) Material, behind the Field Connection Flanges.
Re-Inspection: Repairs completed by Vendor achieving a proper adherence between the Steel and the Fiber Glassing (FRP) Material. See Photos on described Issue.
Benefits to Our Customer: By using Fraza Inspection Team, Customer saved a lot of of time and money preventing excessive expenses per back charges for Re-works at field site per unacceptable issues on Incorrect Filler Metal being used, if Not Corrected/Repaired in timely manner at Vendor Shop.
© 2019 Fraza Inspection Company - All Rights Reserved
Project #1
Project Detail
Project: North Pass Energy Unit 02
Equipment: Exhaust System Equipments
Date: May 2012 to September 2012
Vendor Location: Fabricator of Exhaust System Equipments in Nuevo Leon, Mexico.
Item #1
Witness on Insulation/Fibering per ITP-50921-01 Rev 2 Item 16 and Customer Specification QRT70550 Rev 4.
Items Inspected: Transition Exhaust Item 42.
Findings: Observed at least two locations with Thru Splices-Lap (Splices of two consecutives fibering layers matching), Not Acceptable to Referenced Customer Specification Section 6.0.
Re-Inspection: Referenced Fibering Issues have been corrected in accordance with Requirements per Referenced Project Documents, accordingly the Fibering Process has gone ahead. See Photo as Illustration of Referenced Issue.
Benefits to Our Customer: By using Fraza Inspection Team, Customer saved a lot of of time and money preventing excessive expenses per back charges for Reworks at field site per unacceptable issues on Insulation-Fibering if Not Repaired in timely manner at Vendor Shop.
Project #2
Project Detail
Project: Black Deer Unit 04
Equipments: Oil Water Separators
Date: September 2010 to October 2010
Vendor Location: Oil Water Separators Fabricator in Coahuila, Mexico.
Item #1
Visual Inspection on External Fiber Glassing(FRP) per Inspection Attribute List # 16 and Data Sheet TOB-JH-DS-U-IR-01 Rev 1.
Item Inspected: Circular Extension of Oil Water Separator.
Findings: External Fiber Glassing(FRP) of Circular Extension observed with Lack of Adherence between the Steel and the Fiber Glassing (FRP) Material, behind the Field Connection Flanges.
Re-Inspection: Repairs completed by Vendor achieving a proper adherence between the Steel and the Fiber Glassing (FRP) Material. See Photos on described Issue.
Benefits to Our Customer: By using Fraza Inspection Team, Customer saved a lot of of time and money preventing excessive expenses per back charges for Re-works at field site per unacceptable issues on Incorrect Filler Metal being used, if Not Corrected/Repaired in timely manner at Vendor Shop.